Report
Date This Report Generated:
17 DEC 2025 @ 0105
CORPS OF ENGINEERS, U.S. ARMY
Sacramento District Sacramento, California
DAILY OPERATION OF SUCCESS RESERVOIR, TULE RIVER, CALIFORNIA
DECEMBER 2025
Midnight Storage Mean -------Mean Outflow----------- Gross Pan Prec Top Con Deer Cr @ Flood Control
Date Elev Storage Change Inflow Total* Tule River Pioneer Ditch Evap Evap (in) Storage Trenton Weir Parameter
(ft) (ac-ft) (ac-ft) (Cfs) (cfs) (cfs) (cfs) (ac-ft) (in) (ac-ft) (cfs) (in)
01 606.34 16536 98 83 31.7 31.7 0.0 3 0.05 0.00 12295 0.0 2.47
02 606.38 16566 30 76 60.1 60.1 0.0 2 0.03 0.01 12295 0.0 2.40
03 606.43 16604 38 76 56.2 56.2 0.0 1 0.02 0.00 12295 0.0 2.33
04 606.48 16642 38 77 56.2 56.2 0.0 3 0.04 0.00 12295 0.0 2.26
05 606.54 16687 45 80 56.3 56.2 0.1 2 0.04 0.00 12295 0.0 2.19
06 606.58 16717 30 75 58.5 56.2 2.3 2 0.04 0.00 12295 0.0 2.13
07 606.61 16740 23 72 59.3 56.2 3.1 2 0.03 0.00 12295 0.0 2.07
08 606.64 16763 23 72 59.8 56.2 3.6 2 0.03 0.00 12295 0.0 2.00
09 606.67 16785 23 71 59.3 56.2 3.1 1 0.02 0.00 12295 0.0 1.94
10 606.70 16808 23 71 58.9 56.2 2.6 2 0.03 0.00 12295 0.0 1.89
11 606.73 16831 23 71 58.9 56.2 2.6 2 0.03 0.00 12295 0.0 1.83
12 606.76 16853 23 72 58.9 56.2 2.6 2 0.04 0.01 12295 0.0 1.78
13 606.79 16876 23 71 58.9 56.2 2.6 2 0.03 0.00 12295 0.0 1.72
14 606.81 16891 15 67 58.9 56.3 2.6 2 0.03 0.00 12295 0.0 1.67
15 606.86 16929 38 73 53.1 50.5 2.6 2 0.03 0.00 12295 0.0 1.62
16 606.90 16959 30 65 48.9 46.2 2.6 2 0.03 0.00 12295 0.0 1.57
Totals (cfs) 1172 893.9 863.3 30.6 0.0
Totals (ac-ft) 522 2325 1773.0 30 0.0
Totals (inches) 0.51 0.02
* Totals may not reflect the sum of inputs due to rounding of the presented values
Download plain text