Date This Report Generated:
07 FEB 2023 @ 0705
CORPS OF ENGINEERS, U.S. ARMY
Sacramento District Sacramento, California
DAILY OPERATION OF PINE FLAT RESERVOIR, KINGS RIVER, CALIFORNIA
FEBRUARY 2023
Midnight Storage Storage Mean Evap Mean Change Nat Flow Mill & Nat Flow Pan Prec River Top Con
Date Elev Storage Change Change Outflow (ac-ft) Inflow Upstream At P.F. Hughes @ Piedra Evap (in) [1] Storage
(ft) (ac-ft) (ac-ft) (sfd) (sfd) (sfd) (sfd) (sfd) (sfd) Flow(sfd) (sfd) (in) (sfd) (ac-ft)
01 857.09 526338 250 126 1272.9 17 9 1408 1515 2923 89.5 3012 0.07 0.00 1194 476659
02 857.27 527090 752 379 1245.9 16 8 1633 -1742 -109 84.4 -25 0.07 0.00 1170 478555
03 857.48 527968 878 443 1212.0 18 9 1663 -321 1343 82.3 1425 0.07 0.00 1158 479338
04 857.64 528637 669 337 1243.7 19 10 1591 -218 1372 78.5 1451 0.08 0.38 1140 480232
05 858.28 531318 2681 1352 1172.2 13 7 2531 -134 2396 151.2 2548 0.05 0.48 1585 482232
06 858.64 532829 1511 762 1150.1 16 8 1920 -167 1753 129.0 1882 0.06 0.01 1352 483446
Totals (sfd) 3399 7296.8 50 10745 -1067 9678 614.9 10293 7598
Totals (ac-ft) 6741 14473.3 99 21313 -2117 19196 1219.7 20416 15070
Totals (inches) 0.41 0.87
[1] Kings River below North Fork Kings
Download
plain text