Date This Report Generated:
10 SEP 2024 @ 1705
CORPS OF ENGINEERS, U.S. ARMY
Sacramento District Sacramento, California
DAILY OPERATION OF PINE FLAT RESERVOIR, KINGS RIVER, CALIFORNIA
SEPTEMBER 2024
Midnight Storage Storage Mean Evap Mean Change Nat Flow Mill & Nat Flow Pan Prec River Top Con
Date Elev Storage Change Change Outflow (ac-ft) Inflow Upstream At P.F. Hughes @ Piedra Evap (in) [1] Storage
(ft) (ac-ft) (ac-ft) (sfd) (sfd) (sfd) (sfd) (sfd) (sfd) Flow(sfd) (sfd) (in) (sfd) (ac-ft)
01 825.06 401348 -654 -330 1387.9 64 32 1090 -841 260 0.0 260 0.24 0.00 271 1000000
02 824.99 401094 -254 -128 1198.6 60 30 1101 -777 333 0.0 333 0.23 0.00 269 1000000
03 824.92 400840 -254 -128 1153.0 63 32 1057 -762 305 0.0 305 0.24 0.00 268 1000000
04 824.86 400622 -218 -110 1153.0 63 32 1075 -842 243 0.0 243 0.24 0.00 265 1000000
05 824.80 400405 -217 -109 1130.8 66 33 1055 -804 261 0.0 261 0.25 0.00 248 1000000
06 824.73 400151 -254 -128 1128.0 59 30 1030 -745 294 0.0 294 0.22 0.01 235 1000000
07 824.69 400006 -145 -73 1103.8 59 30 1060 -768 302 0.0 302 0.22 0.00 233 1000000
08 824.64 399825 -181 -91 1103.1 62 31 1043 -798 255 0.0 255 0.23 0.00 232 1000000
09 824.59 399644 -181 -91 1103.8 65 33 1045 -787 268 0.0 268 0.25 0.00 230 1000000
Totals (sfd) -1189 10462.0 283 9556 -7124 2520 0.0 2520 2251
Totals (ac-ft) -2358 20751.3 561 18954 -14130 4999 0.0 4999 4465
Totals (inches) 2.12 0.01
[1] Kings River below North Fork Kings
Download
plain text