Date This Report Generated:
06 DEC 2023 @ 1205
CORPS OF ENGINEERS, U.S. ARMY
Sacramento District Sacramento, California
DAILY OPERATION OF HIDDEN RESERVOIR, FRESNO RIVER, CALIFORNIA
DECEMBER 2023
Midnight Storage Mean Mean Gross Pan Prec Top Con Flood Control
Date Elev Storage Change Inflow Outflow Evap Evap (in) Storage Parameter
(ft) (ac-ft) (ac-ft) (sfd) (sfd) (ac-ft) (in) (ac-ft) (in)
01 467.24 12629 37 20 0.2 3 0.07 0.00 25000 0.57
02 467.32 12671 42 23 0.2 3 0.07 0.00 25000 0.56
03 467.40 12713 42 22 0.3 2 0.05 0.00 25000 0.54
04 467.49 12761 48 26 0.4 3 0.07 0.00 25000 0.52
05 467.58 12809 48 27 0.6 4 0.09 0.00 25000 0.53
Totals (sfd) 118 1.7
Totals (ac-ft) 217 235 3.3 14
Totals (inches) 0.35 0.00
Download
plain text