Report

                                                   Date This Report Generated:
                                                            06 DEC 2023 @ 1205        
 
 
 
                         CORPS OF ENGINEERS, U.S. ARMY
              Sacramento District           Sacramento, California
 
        DAILY OPERATION OF HIDDEN RESERVOIR, FRESNO RIVER, CALIFORNIA
 
                               DECEMBER  2023      
 
         Midnight    Storage   Mean     Mean     Gross     Pan   Prec  Top Con Flood Control
 Date  Elev  Storage  Change  Inflow   Outflow    Evap    Evap   (in)  Storage Parameter
       (ft)  (ac-ft) (ac-ft)   (sfd)    (sfd)   (ac-ft)   (in)         (ac-ft) (in)
   01  467.24  12629      37     20       0.2       3     0.07   0.00    25000   0.57    
   02  467.32  12671      42     23       0.2       3     0.07   0.00    25000   0.56    
   03  467.40  12713      42     22       0.3       2     0.05   0.00    25000   0.54    
   04  467.49  12761      48     26       0.4       3     0.07   0.00    25000   0.52    
   05  467.58  12809      48     27       0.6       4     0.09   0.00    25000   0.53    
 
 
 
 
 
 
 Totals (sfd)                   118       1.7     
 Totals (ac-ft)          217    235       3.3      14     
 Totals (inches)                                          0.35   0.00
 

Download plain text