Date This Report Generated:
07 FEB 2023 @ 0605
CORPS OF ENGINEERS, U.S. ARMY
Sacramento District Sacramento, California
DAILY OPERATION OF HIDDEN RESERVOIR, FRESNO RIVER, CALIFORNIA
FEBRUARY 2023
Midnight Storage Mean Mean Gross Pan Prec Top Con Flood Control
Date Elev Storage Change Inflow Outflow Evap Evap (in) Storage Parameter
(ft) (ac-ft) (ac-ft) (sfd) (sfd) (ac-ft) (in) (ac-ft) (in)
01 489.83 28407 87 259 213.0 5 0.10 0.00 26089 9.40
02 490.03 28582 175 240 149.3 5 0.10 0.00 26637 9.12
03 490.20 28731 149 229 151.0 6 0.11 0.00 27191 8.84
04 490.36 28872 141 225 151.0 6 0.11 0.07 26833 9.05
05 491.16 29583 711 512 151.9 3 0.05 1.09 25812 9.59
06 491.78 30141 558 435 152.6 2 0.05 0.01 26381 9.32
Totals (sfd) 1900 968.8
Totals (ac-ft) 1821 3769 1921.6 27
Totals (inches) 0.52 1.17
Download
plain text