| Plot Menu Page | Plot |
	  24APR18    12:38:43                                                  PAGE    1

                EAST CANYON  EAST CANYON  EAST CANYON  EAST CANYON 
                                                                   
                FLOW-RES IN  FLOW-RES OUT TOP CON STOR STOR-RES EOP
                cfs          cfs          ac-ft        ac-ft   
 TIME  DATE     PER-AVER     PER-AVER     INST-VAL     INST-VAL
  
 2400 19APR2018         39.0          8.0       50516.       48165.
 2400 20APR2018         68.0          8.0       50487.       48283.
 2400 21APR2018         58.0          9.0       50484.       48382.
 2400 22APR2018         52.0          9.0       50482.       48468.
 2400 23APR2018         66.0          9.0       50496.       48581.
*** Advisory: Inflows are a computed value. The inflows are computed from changes in storages which can produce erratic hourly results. Inflows can be averaged over several hours to produce a more realistic value.