| Plot Menu Page | Plot |
	  21APR18    20:37:34                                                  PAGE    1

                EAST CANYON  EAST CANYON  EAST CANYON  EAST CANYON 
                                                                   
                FLOW-RES IN  FLOW-RES OUT TOP CON STOR STOR-RES EOP
                cfs          cfs          ac-ft        ac-ft   
 TIME  DATE     PER-AVER     PER-AVER     INST-VAL     INST-VAL
  
 2400 11APR2018         61.0          8.0       51089.       47294.
 2400 12APR2018         83.0          8.0       50989.       47443.
 2400 13APR2018         71.0          8.0       50899.       47568.
 2400 14APR2018         67.0          8.0       50817.       47685.
 2400 15APR2018         68.0          8.0       50745.       47803.
 2400 16APR2018         48.0          8.0       50674.       47882.
 2400 17APR2018         65.0          8.0       50618.       47994.
 2400 18APR2018         64.0          8.0       50570.       48105.
 2400 19APR2018         39.0          8.0       50516.       48165.
 2400 20APR2018         68.0          8.0       50487.       48283.
*** Advisory: Inflows are a computed value. The inflows are computed from changes in storages which can produce erratic hourly results. Inflows can be averaged over several hours to produce a more realistic value.